How we get iridium
How much do we make each year, and how?
Mines have supplied about 7 tonnes of new iridium a year since 2021, by Johnson Matthey's figures. It is a by-product of platinum and palladium mines, mostly in South Africa and Zimbabwe. Estimates of recycling from discarded products are 0% (UK) and 20 to 30% (UNEP, 2011).
Iridium is one of the platinum group metals. How they are mined, separated, sold and controlled →
Last updated 14 October 2026.
How much is produced
- Production
-
~ 7.1tonnes a year1
2025. Primary supply of iridium in 2025, tonnes, from Johnson Matthey (JM). JM counts sales of new metal by mining companies, not the metal in the ore mined. JM gives 229,000 troy ounces.
USGS gives no production figure for iridium alone.
Show the numbers
| Year | t |
|---|---|
| 2015 | 7.4 |
| 2016 | 8.5 |
| 2017 | 7.9 |
| 2018 | 7.3 |
| 2019 | 7.3 |
| 2020 | 7.3 |
| 2021 | 7.3 |
| 2022 | 6.8 |
| 2023 | 7.1 |
| 2024 | 7.4 |
| 2025 | 7.1 |
Johnson Matthey (JM) puts primary supply of iridium at 7.1 tonnes in 20251. Primary supply is the new metal that mining companies sell. It has stayed between 6.8 and 7.4 tonnes each year since 2021. JM gives 229,000 troy ounces for 20251. USGS gives no production figure for iridium alone.
All the new iridium of 2025 would fit in a cube about 70 centimeters on each side. This is our calculation, at the density that PubChem gives, 22.42 grams per cubic centimeter. The RSC podcast gives about 3 tonnes a year, an older and lower figure3.
Who produces it
JM writes that over 95% of primary iridium and ruthenium comes from South Africa and Zimbabwe5. The power chapter gives South Africa’s share alone. The mines and the other producing countries are on the platinum group page.
How it is mined and refined
Iridium comes from the same ore and the same refineries as platinum and palladium. The steps that separate the six metals are on the platinum group page. JM writes that rhodium, ruthenium and iridium are technically complex to refine and take a long time to process5.
So a stop at one South African plant can delay iridium supply. In 2020 outages at the converter plant of Anglo American Platinum left a backlog of about one million ounces of platinum group metals5. The plant started again in December 2020, but iridium came out of the backlog slowly5.
What it costs to produce
No source we read gives a cost of production for iridium alone. A mine pays for its costs with the whole basket of metals it sells. The society chapter has what the high prices of 2025 meant for producers.
Recycling
- End-of-life recycling
-
0%4
Other sources: 20 to 30% (UNEP, 2011)6.
World end-of-life recycling rate weighted by end use, UK Critical Minerals Intelligence Centre 2024. The UK table gives 0% for each use (electrochemical, electrical and electronics, chemical, other), with use shares from Johnson Matthey.
Johnson Matthey counts demand net of closed-loop recycling, in which users keep ownership of their metal while it goes back for refining. That metal is not old scrap from products thrown away.
- Recycled content
-
18%6
Recycled content (share of scrap in metal production), 15 to 20%, UNEP International Resource Panel 2011.
Range 15% to 20%.
The published rates of end-of-life recycling differ. The UK gives 0% for iridium, for each of its four main uses4. UNEP (2011) gives 20 to 30%6.
UNEP gives a recycled content of 15 to 20%6. Some users keep ownership of their metal and send it back for refining. JM counts demand after this closed-loop recycling1. JM expects that iridium will also be recovered from electrolyzers at the end of their life, in a closed loop5.
Sources
- 1
Johnson Matthey, 2026. PGM market report May 2026 , Market overview: ruthenium and iridium; Industrial demand; Outlook; Iridium supply and demand table, p. 33.
World supply and demand of iridium by use, 2021 to 2026, the price record of 2026, strategic buying, crucibles, copper foil and PEM electrolysis.
-
Total primary supply 7.3 6.8 7.1 7.4 7.1
-
Total primary supply 235 218 229 237 229
-
net of any closed-loop recycling (i.e. where industry participants retain ownership of the metal)
-
- 2
Johnson Matthey, 2026. PGM supply and demand history (May 2026) , Iridium sheet.
World iridium supply and demand by application, 2015 to 2026, in thousand troy ounces.
-
Iridium supply and demand ... Primary supply 238 274 254 234 235 236 235 218 229 237 229 229
-
- 3
Royal Society of Chemistry, 2026. Iridium - Element information, properties and uses , Uses and properties; History; podcast 'Chemistry in its element: iridium' (Brian Clegg).
Uses of iridium, its discovery and name, Davy's melting experiment, and the iridium layer at the end of the Cretaceous.
-
There are only about 3 tonnes of iridium produced each year
-
- 4
UK Critical Minerals Intelligence Centre, British Geological Survey, 2024. UK 2024 Criticality Assessment , Table 1; criticality scores; production concentration; end-of-life recycling rates by use; deposit types; trade concentration.
Iridium's criticality score, South Africa's share of mined iridium, the recycling rate, deposit types and import shares.
-
South Africa averages 90.5 per cent, 81.6 per cent, 78.8 per cent, 69.0 per cent and 35.4 per cent of mined Ru, iridium (Ir)
-
Iridium (Ir) 0 Zirconium (Zr) 0
-
Iridium (Ir) Electrochemical 46 0
-
- 5
Johnson Matthey, 2022. PGM market report May 2022 , Overview and market balance; Ruthenium and iridium: review of 2021; Iridium demand.
The record price of April 2021, the share of iridium in the ore, crucibles, spark plugs, copper foil and PEM electrolysis.
-
Ruthenium and iridium are much less exposed to Russian supply risk, as over 95% of primary supplies come from South Africa and Zimbabwe
-
the ‘insoluble’ PGM (rhodium, ruthenium and iridium) are technically complex to refine and have long processing lead-times
-
outages at Anglo American Platinum’s converter plant (ACP) during 2020, which created a backlog containing around one million ounces of PGM
-
Although the ACP resumed production in December 2020, the ‘insoluble’ PGM (rhodium, ruthenium and iridium) are technically complex to refine and have long processing lead-times
-
the development of a closed recycling loop will ensure that iridium is recovered efficiently from end-of-life electrolysers
-
- 6
UNEP International Resource Panel (T.E. Graedel et al.), 2011. Recycling Rates of Metals: A Status Report , Table 3 and notes; Appendix E.
Recycled content and end-of-life recycling rate of iridium, and its main uses.
-
Ir > 80 15 –20 20–30
-